Terminado de las paredes y reboques, de los dos departamentosºººººFinished the walls and plastering of the two apartments.

@comandoyeya · 2025-09-19 08:07 · Cervantes

Hola a todos como bien lo habran podido leer en mis publicaciones anteriore, referente a la construccion de dos departamentos, para mi hijo, buen amigos luego de haberme ausentado de dicho trabajao por el lapso de un mes, por haber viajado a buenos aires, para mis controles de oncologia, bueno referrente a eso estoy mas que agradecido con el SEÑOR, porque me sano y lo puedo manifestar, asi que de regreso segui en la obra ultimando los detalles y haber terminado , faltas algunos detalles nada mas.

image.png

Lo que se io en la foto anterior, seria el nuevo baño de uno de los departamentos, con la ventania que coloque y esta foto es la parte de la pared grande en donde estaba la columna, bueno la verdad queo muy bien.

image.png

Esto seri una de la paredes del lateral del baño, se nota asi el reboque por el hecho de que lo hice en dos partes, pero bueno en la medida que se pueda es dejar todo lo mejor posible jajajaja.

image.png

Esta seria otra de las paredes de la parte mas ampli de dicho departamente, se ve asi porque recien estoy culminando la totalidad del reboque, esta un poco fresco el mismo.

image.png

Bueno lo que observamos en esta fotografia, seria la mucheta de la puerta de ingreso a uno de los baños, luego se le va a agregar una puerta plegadiza, por eso la mucheta queda asi.

image.png

Desde la parte exterior o sea de atras, podemos observar las ventanas de los baños y de las cocinas, la verdad las coloque un poco mas alta por el hecho de tener privacidad en la parte de atras, donde se encuentra la casa, como todo esto es para alquilar en la parte de adelante.

image.png

Bueno amigos, lo que falta es colocar cielorrazo, terminar un baño y colocar los muebles de la cocina, que eso es lo mas facil, para que todo quede devidamente terminadfo.

MUCHAS GRACIAS POR SEGUIRME Y LEERME, QUE TENGAN UN EXCELENTE DIA.

ENGLISH

Hello everyone, as you may have read in my previous posts, regarding the construction of two apartments for my son, good friends, after being absent from this work for a month due to traveling to Buenos Aires for my oncology check-ups, well, regarding that, I am more than grateful to the LORD because He healed me and I can express it, so upon my return, I continued with the work, finalizing the details and having finished, just a few details left.

image.png

What you see in the previous photo would be the new bathroom of one of the apartments, with the window I installed, and this photo shows the part of the large wall where the column used to be. Well, honestly, it turned out very well.

image.png

This would be one of the side walls of the bathroom, you can see the plastering because I did it in two parts, but well, as much as possible, it's about leaving everything as best as possible, hahaha.

image.png

This would be another wall of the larger part of this apartment, it looks like this because I am just finishing the entire plastering, it is still a bit fresh.

image.png

Well, what we observe in this photograph is the door jamb of the entrance to one of the bathrooms. A folding door will be added later, which is why the jamb looks like this.

image.png

From the exterior, that is, from the back, we can see the windows of the bathrooms and the kitchens. Honestly, I placed them a bit higher to ensure privacy in the back where the house is located, since all of this is for rent in the front part.

image.png

Well, friends, what's left is to install the ceiling, finish a bathroom, and put in the kitchen furniture, which is the easiest part, so that everything is properly finished.

Thank you very much for following and reading me, have an excellent day.

#job #dclub #gems #ecency #entropia #qurator #family #profoffbrain #spanish #photography
Payout: 0.000 HBD