


#
**ENERGY REFILL CONTEST**
**WINNERS**
This week has been very wonderful for the contest, we had 52 wonderful submissions full of motivation, reflective phrases, good advices and above all full of **positive energy**.
This week's phrase was: **"Enjoy things by looking them in a different perspective"** - @blukei
First of all i must say that i am very grateful to all the participants and those who helped make this contest possible, the truth is that it was very difficult to choose the winners, but you have to choose, here they are:
- Drum rolls -

##
**AND THE WINNERS ARE:**

# **CONCURSO ENERGY REFILL**
**GANADORES**
Esta semana ha sido muy buena para el concurso, tuvimos 52 maravillosas entradas llenas de motivación, frases reflexivas y sobre todo llenas de **energía positiva**.
La frase de esta semana fué: **“Disfruta de las cosas mirándolas desde una perspectiva diferente"** - @blukei
Antes que nada debo decir que estoy muy agradecida con todos los participantes y los que ayudaron a que este concurso sea posible, la verdad es que fué muy difícil elegir los ganadores, pero hay que elegir, aquí están:
- Redobles de tambores -

##
**Y LOS GANADORES SON:**

The winner is @emybaby, she made approximately 30 comments to his colleagues winning this award, apart from this he leaves us an excellent message breaking down that everything is energy, and he leaves us a good point of view, excellent publication.
I invite you to read it [here](https://peakd.com/hive-148441/@emybaby/esoren-energy-refill-contest-disfruta-de-las-cosas-mirandolas-desde-una-perspectiva-diferente).
La ganadora es @emybaby, realizó aproximadamente 30 comentarios a sus compañeros ganando así este premio, a parte de esto nos deja un excelente mensaje desglosando que toda es energía, y nos deja un buen punto de vista, excelente publicación.
Te invito a leer su post [aquí.](https://peakd.com/hive-148441/@emybaby/esoren-energy-refill-contest-disfruta-de-las-cosas-mirandolas-desde-una-perspectiva-diferente)

This week's favourite posts were:
- @doriangel
Ella identificó momentos en los cuales ha tenido que ver la vida desde otra perspectiva, que a pesar de su caso personal el no poderse graduar en el tiempo indicado pudo sacar un buen mensaje y ver el lado positivo de las cosas.
I invite you to read her post [here](https://peakd.com/hive-174578/@doriangel/disfruta-de-las-cosas-mirandolas-desde-una-perspectiva-diferente-esp-eng-enjoy-things-by-looking-at-them-from-a-different-perspe)
- @montejim
He talks about the fact that in many occasions people keep planning our lives either in the short, medium or long term and many times these plans are not accurate, but we must keep in mind that despite not getting the expected result, we must be able to enjoy every phase, moment in our lives and be grateful.
I invite you to read her post [here.](https://peakd.com/hive-148441/@montejim/esp-eng-energy-refill-round-19-una-frase-para-la-reflexion-concurso-a-sentence-for-reflection-contest)
- @fragozar01
He shared an anecdote in which he put the phrase into practice, seeing the positive side of things and accepting the situations that come our way! Excellent inspirational post.
I invite you to read his post [here.](https://peakd.com/hive-150329/@fragozar01/you-can-do-it-energy)
Los posts favoritos de esta semana fueron:
- @doriangel
Ella identificó momentos en los cuales ha tenido que ver la vida desde otra perspectiva, que a pesar de su caso personal el no poderse graduar en el tiempo indicado pudo sacar un buen mensaje y ver el lado positivo de las cosas.
Te invito a leer su post [aquí.](https://peakd.com/hive-174578/@doriangel/disfruta-de-las-cosas-mirandolas-desde-una-perspectiva-diferente-esp-eng-enjoy-things-by-looking-at-them-from-a-different-perspe)
- @montejim
Habla de que en muchas ocasiones las personas nos mantenemos realizando una planificación de nuestras vidas ya sea a corto, mediano o largo plazo y muchas veces estas planificaciones no son certeras, pero debemos tener presente que a pesar de no obtener el resultado esperado, debemos ser capaces de disfrutar cada fase, momento existente en nuestra vida y ser agradecidos.
Te invito a leer su post [aquí.](https://peakd.com/hive-148441/@montejim/esp-eng-energy-refill-round-19-una-frase-para-la-reflexion-concurso-a-sentence-for-reflection-contest)
- @fragozar01
Compartió una anécdota en la que puso en practica la frase, viendo el lado positivo de las cosas y aceptando las situaciones que se nos presenten! Excelente post inspiracional.
Te invito a leer su post [aquí.](https://peakd.com/hive-150329/@fragozar01/you-can-do-it-energy)

The winner of this award is @ylcemar as she not only gives us an excellent contribution but also really highlights what the phrase actually indicates: to look for the solution to things with the best face, no matter how precarious it may look. That's exactly what we can do as you say, try new things in new situations and enjoy them, instead of often complaining and feeling the moment as a regret.
I invite you to read her post [here.](https://peakd.com/hive-186377/@ylcemar/energy-refill-contest-round-19engesp)
La ganadora de este premio es @ylcemar ya que además de brindarnos un excelente aporte y realmente resalta lo que la frase indica en realidad: buscar la solución de las cosas con la mejor cara, sin importar que tan precaria pueda verse la misma. Es exactamente eso lo que podemos hacer tal y como expresas, probar nuevas cosas en situaciones nuevas y disfrutar de las mismas, en vez de muchas veces quejarnos y sentir el momento como un pesar.
Te invito a leer su post [aquí.](https://peakd.com/hive-186377/@ylcemar/energy-refill-contest-round-19engesp)

The winner of this award is @omaira74. She made an excellent reflection on the phrase! Certainly having a positive outlook on life helps us to be able to work more clearly on what we want and also to understand that everything will turn out well no matter what happens. In this way, we can work on a day-to-day basis without worries and thoughts that can slow us down.
I invite you to read her post [here.](https://peakd.com/hive-148441/@omaira74/esp-eng-energi-refill-concurso-disfruta-de-las-cosas-mirandolas-desde-una-perspectiva-diferente-energi-refill-contest-enjoy-thi)
La ganadora de este premio es @omaira74. Ya que hizo una excelente reflexión sobre la frase! Ciertamente llevar un sentido positivo de la vida nos ayuda a poder trabajar de forma más clara sobre lo que queremos y además poder entender que todo saldrá bien sin importar lo que pase. De esta forma, podemos trabajar en el día a día sin preocupaciones ni pensamientos que nos puedan retrasar.
Te invito a leer su post [aquí.](https://peakd.com/hive-148441/@omaira74/esp-eng-energi-refill-concurso-disfruta-de-las-cosas-mirandolas-desde-una-perspectiva-diferente-energi-refill-contest-enjoy-thi)

## Congratulations!
Thank you all so much for participating, I was really happy to see that you liked the contest and that it got a lot of approval.
Thanks also to all those who make this contest possible: @wesphilbin and @enginewitty for all the support they are giving to the contest. And to the SMILE team. And the super powerful girls @sacra97 @mafalda2018 and @marybellrg. I know that little by little we will continue to fill Hive with **positive energy**!
Thanks again and remember, **Enjoy things by looking them in a different perspective**.
I invite you to participate in Round 20, I invite you to go through this post: [Energy Refill Contest - Round 20](https://peakd.com/hive-150329/@tripode/energy-refill-contest-bonus-round-20-100-hbi-in-pool-prices-eng-esp) and know this week's sentence.
## ¡Muchas felicidades!
Mil gracias a todos por participar, de verdad que me he sentido muy feliz al ver que les ha gustado el concurso y ha tenido mucha aprobación.
Gracias también a todos los que hacen posible este concurso: @wesphilbin y @enginewitty por todo el apoyo que le están dando al concurso. Y al equipo de SMILE. Y las chicas super poderosas @sacra97 @mafalda2018 y @marybellrg. Sé que poco a poco seguiremos llenando de **energía positiva** a Hive!
Gracias de nuevo y recuerda, **Disfruta de las cosas mirándolas desde una perspectiva diferente**
Te invito a participar en la Ronda 20, te invito a pasar por este post: [Energy Refill Contest - Round 20](https://peakd.com/hive-150329/@tripode/energy-refill-contest-bonus-round-20-100-hbi-in-pool-prices-eng-esp) y conocer la frase de esta semana.

## List of participants
Here is the list of participants and the approved conditions, thanks a thousand for the good vibes and remember to READ THE POST OF THE WEEK, it is always updated with new prizes and rules.
#ER - Tag #energyrefill
#TD - Label #thoughtfuldailypost
CL - Comment in original post
COM - Number of comments in other posts
SMILE - Post on SMILE server on Discord channel of #energyrefill-posts
TW - shared on twitter
INV - Invited friends
APROB - Approved to participate
## Listado de participantes
Aquí dejo el listado de participantes y las condiciones aprobadas, gracias mil por la buena vibra y recuerden LEER EL POST DE LA SEMANA, siempre se actualiza con nuevos premios y reglas.
#ER - Etiqueta #energyrefill
#TD - Etiqueta #thoughtfuldailypost
CL - Comentario en el post original
COM - Cantidad de comentarios en otros posts
SMILE - Post en el servidor de SMILE en Discord canal de #energyrefill-posts
TW - compartió en twitter
INV - Invitó amigos
APROB - Aprobado para participar





This contest is possible thanks to @wesphilbin @enginewitty and the SMILE initiative.
Este concurso es posible gracias @wesphilbin @enginewitty y la iniciativa SMILE.
---
###
Sponsors / Patrocinadores

Give some cool vote for [Witty thing.](https://hivesigner.com/sign/account-witness-vote?witness=enginewitty&approve=1)

#thoughtfuldailypost by @wesphilbin
[](https://peakd.com/c/hive-163921/created)
Click the banner to get redirect to [Blogging Challenge Community](https://peakd.com/c/hive-163921/created)
[](https://discord.gg/d47KyHB)
Click the banner to get redirect to SMILE server, or: https://discord.gg/d47KyHB

[](https://www.facebook.com/Tripode-103071808224535/) [](https://www.instagram.com/tripode.rd/) [](https://twitter.com/tripode_rd) [](https://www.pinterest.es/tripode_rd/_saved/)
---
**[--> Check out our products here <--](https://linktr.ee/tripode)**
---

---
Avatar created by @frankches and other illustrations are created by me.
#energyrefill
#thoughtfuldailypost
#spanish
#contest
#cervantes
#palnet
#neoxian
#smi-le
#archon
Payout: 0.000 HBD
Votes: 279
More interactions (upvote, reblog, reply) coming soon.